Working bee plans
Buildings:
-rebuild bakery and other main field buildings (3 buildings), fix up motorpool, build smaller peices of cover between buildigns to fill gaps
-required materials; pallets, tech screws, pegs, ply, iron, etc
Towers:
-build 3 Towers; 1 at chem plant, 1 at trenches, 1 at village
-required materials; 4 posts per tower, 6x2 timber for floor framing, timber for ladders, pallets, ply, iron, etc
Chem Yard/Comp field:
-build symetrical competition style field where the old chemical plant was
-required materials; ibc's (organise with spartan to pick up), pallets, tech screws, ply, iron, etc
Trenches:
-sandbag + tidy up edges.
-put cover on every end of trench, create cross configured pallets for stability. develop into bunkers.-use sandbags to improve defensive cover on existing and new 'bunker/pillbox' ends of trench
-required materials; sand bags, pallets, ply, iron, etc
Materials required:
pallets - as many as possible
pegs - as many as possible
tech screws - Torak to source - 75mm and 100mm
ply - as much as possible
iron - as much as possible
posts - 12x 4m farm posts - Torak to souce
6x2 timber for floor framing - 40m - Torak to source
timber for ladders - 25m - Torak to source
ibc's - as many as possible - Torak and Spartan to organise
sandbags - in container
Tools Required:
Tech guns
Hand tools - hammers, sledge hammers, crow bars, etc
Shovels
Digger with auger (torak to try to organise, if not we will dig by hand)
Submerisble pump + hose to fill ibc's with water
Dazzle
Measuring whee
lPost hole rammer
Toraks Friday list:
ATV
Rope
Fuel
Fire wood
Brazier
Camping gear (gazebos, chairs etc)
Bbs
Tech screws
Submersible + hose
We plan to camp on site and work through both days.